Instruments:

  • ISIS - Crisp, Inter, Offspec, Polref, Surf
  • SNS - MR, LR

Requirements:

Short Term

Nexus Loading Performance

  • Fixed in R3.4

Harmonisation

  • Harmonisation of IDFs and reduction procedures across instruments (inc OFFSPEC) - Done in R3.4, improved by tickets #11806
  • Assessment of SNS GUI interface for use at ISIS
    • Initial Assessment complete by Scientists - Concepts and functionality good
    • Codebase could provide maintenance and extensibility challenges
    • Need to plan way forward

Others

  • Event mode filtering - fixed in R3.3
  • Table based gui for data reduction - Fixed in R3.3

Mid Term

Harmonisation

Ticket Summary Milestone Owner Status Priority Keywords
#8928 Unify ISIS refl simple UI to work everywhere Release 3.5 Jean Bilheux assigned critical SSC,2014,All reflHarmony
#8929 refl benchmarks Release 3.5 Jean Bilheux assigned critical SSC,2014,All reflHarmony
#9296 Refactor complex GUI to use either Numpy or Mantid as a back-end Release 3.5 new critical SSC,2014,All reflHarmony
#9297 Make complex GUI work for ISIS instruments Release 3.5 new critical SSC,2014,All reflHarmony
#11310 QuickNXS with support for different back ends Release 3.5 new critical SSC, 2015, All reflHarmony
#11311 QuickNXS with mantid back end Release 3.5 new critical SSC, 2015, All reflHarmony
#11806 OFFSPEC IDF Release 3.5 Owen Arnold verifying blocker reflHarmony

Others

Ticket Summary Milestone Owner Status Priority Keywords
#11308 REFM instrument definition Release 3.5 Jean Bilheux new critical SSC, 2015, SNS reflOther
#11309 REFL instrument definition Release 3.5 Jean Bilheux new critical SSC, 2015, SNS, reflOther
#11834 Combination of QxQz maps Release 3.5 Owen Arnold new major reflOther
#9298 Offspec tools sub project Release 3.6 new critical SSC,2014,All reflOther

  • Statistical analysis of live data capture (link with inst control)
    • Instrument scientists to define sample stopping criteria
    • New Ticket to implment
  • Seamless iteractive scanning - Requirements meeting needed

Long term

  • Seamless integration of modelling packages - Requirements meeting needed

Total Open Relectometry Tickets

51